NOTE: This estimate is for the extension of City Utilities from the existing mains to the described site only.
-
This Fee must be paid before work will begin on the estimate. Failure to pay at time of the Utility Estimate Application submittal will result in dismissal.
-
The tap estimate is based upon 5/8” meter, and a 2” pressure sewer service or 4” gravity sewer service
-
A utility estimate no older than six months is required as the basis for a permit for that work.